Six failures that show up between purchase order and shipment at bag suppliers, and the control built into the 10-step process to remove each one. Bulk bags 2 cm smaller than the sample Cause: pattern re-drafted for the bulk cut. Control: the pattern is frozen with the golden sample on Day 0–1; the pre-production sample from the bulk roll is measured to ±1 cm before the line starts. Defects found only at final inspection Cause: no inline check. Control: QC points at incoming material, pre-processing and three points on the line, so a seam or logo fault is fixed within the shift. See inline inspection . Ship date moves after the deposit Cause: materials ordered late. Control: purchase orders released on Day 0 against the deposit; out-of-network fabric and custom moulds are flagged in the quote with their +7–15 days. Colour differs between two cartons Cause: two fabric lots on one order. Control: lots checked against the lab dip at incoming inspection and cut lot by lot; cartons are marked with the lot so a split is visible. No visibility for 4 weeks Cause: updates only on request. Control: weekly photo and video report from the line and a 24-hour reply from one project manager . Cartons rejected at the warehouse Cause: labels, polybag warnings or carton size not matched to the receiving warehouse’s rules. Control: the packing spec is written into the tech pack before the deposit, including Amazon’s 50 lb standard carton weight limit for FBA, and every carton is checked against it at packing inspection. packing inspection . FBA . Factory
packing inspection.